Project Lists

Date Contract Contract Project Name / Location Contract worksCut date Remark
2017 Projexasia Limited Hong Kong Football Training Centre Phase 1, Tseung Kwan O Stage 1 (TKO1) Landfill, N.T., Hong Kong Sub-Contract of Site Formation and Foundation Works10/5/2016 In Progress
2017 Modern Terminal Ltd Terminals 9 Structure Survey and Maintenance Work for T9 Exit Gate & Entry Gate Canopies9/23/2016 Completed
2016 China State Construction International Holdings Ltd West Kowloon Water Supply Pipeline Phase 3 Maintenance Works Restore pavement works2/27/2016 Completed
2016 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works The existing solid material building of the stone structure of the wall structure3/27/2016 Completed
2016 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Outfall Pumping Station (Non – structural repair works)3/27/2016 Completed
2016 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Terminal Manhole Inside – built stone fog wall works3/27/2016 Completed
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill Pedestrian tunnel, weather station, four Longkou ventilation floor, foot and scales foot structure works12/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill Road & Drainage Works (North Side depress)11/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill Install only of Holding Down Bolt for Steel Parapet at Retaining Walls and Bridges2/29/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill Jacking under AEL at T002 – Segment3/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill RC Structure of SHT Cut and Cover Tunnel (Zone B at T002)3/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill T001隧道結構 (Shaft2, Shaft 3, Zone A & Zone A1)12/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill RC Structure of SHT Tunnel (Shaft 2,3 Zone)12/30/2016 In Progress
2016 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill RC Structure of SHT Tunnel (Box Jacking Segment)10/30/2016 In Progress
2016 Partneer Construction Limited Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road Structure for SHT Cut and Cover Tunnel & Approaching Ramp3/5/2016 Completed
2016 Modern Terminal Ltd Terminals 9 Modification of Gatic Covers in Terminal 97/28/2016 Completed
2016 Modern Terminal Ltd Kwai Chung Container Terminal 5 Kwai Chung Container Terminal 5 Pavement Upgrading Works for Quay Cranes Landside Shuffling 8/15/2016 Completed
2015 Kaden-Leader Reprovisioning of Harbour Road Sports Centre and Wan Chai Swimming Pool Ducting and Roadworks at the Junction of Flemming Road and Convention Avenue and Construction of Bus Shelter at Habour Road12/24/2015 Completed
2015 China State Construction International Holdings Ltd Tolo Highway Extension Phase I Yuanzhou Tsai reduction project and additional construction2/26/2015 Completed
2015 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Additional details of the pit2/27/2015 Completed
2015 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works CEPT water tank seal works2/27/2015 Completed
2015 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works N1 Well test water seal hole works2/27/2015 Completed
2015 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Repairing the By-pass Pipelines 6/27/2015 Completed
2015 China State Construction International Holdings Ltd Harbour Area Treatment Scheme Stage 1 Upgrading Works at Stonecutters Island Sewage Treatment Works – Sludge Treatment Facilities Mechanical and electrical throat earthwork11/24/2015 Completed
2015 China State Construction International Holdings Ltd Harbour Area Treatment Scheme Stage 1 Upgrading Works at Stonecutters Island Sewage Treatment Works – Sludge Treatment Facilities Sporadic works (1)11/24/2015 Completed
2015 China State Construction International Holdings Ltd Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill Miscellaneous for PR9 Temporary Water Diversion6/30/2015 Completed
2015 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. Libra stone to the foot of the project11/30/2015 Completed
2015 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. DAFII – Baffle works11/30/2015 Completed
2015 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. Temporary installation works (II)12/31/2015 Completed
2015 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. Temporary hoarding works5/31/2015 Completed
2015 Ming Shing Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road Sub-Sub-Contract Works: RC Structure for PR9 Spill Trap (PR9)11/27/2015 Completed
2015 Ming Shing Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road Sub-Sub-Contract Works:Structure for SHT Cut and Cover Tunnel (Package 2) & Construction of External U-Trough at Depressed Roundabout 11/4/2015 Completed
2015 Ming Shing Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road Sub-Sub-Contract for Reinforced Concrete Structure of SHT Cut and Cover Tunnel & Approaching Ramp and Construction of New U-Trough at Depressed Roundabout5/6/2015 Completed
2014 China State Construction International Holdings Ltd Tolo Highway Extension Phase I To build and restore the original retaining wall works9/26/2014 Completed
2014 China State Construction International Holdings Ltd Tolo Highway Extension Phase I Construction of staircase handrails for stone walls and high mastheads10/26/2014 Completed
2014 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works The existing solid processing building site clearance works and stone structure works11/27/2014 Completed
2014 China State Construction International Holdings Ltd Harbour Area Treatment Scheme Stage 1 Upgrading Works at Stonecutters Island Sewage Treatment Works – Sludge Treatment Facilities Prous Pavement at Portion D7/24/2014 Completed
2014 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. Site office toilet project6/30/2014 Completed
2014 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. PG1 Sealing works8/31/2014 Completed
2014 China State Construction International Holdings Ltd Tai Po Water Treatment Works and ancillary raw water and fresh water transfer facilities. SPH – Temporary hoarding works12/31/2014 Completed
2014 Sun Chong (Civil) Engineering Kai Tak Development Reconstruction and upgrading of Kai Tak Nullah R.C Structure Works4/25/2014 Completed
2013 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Sniffing bridge earthwork and stone structure2/27/2013 Completed
2013 China State Construction International Holdings Ltd Pillar Point Sewage Treatment Works Fire pump room and line pit project9/27/2013 Completed
2013 Friendly Benefit Engineering Ltd Kai Tak Development Kai Tak Development – Advance Infrastructure works Developments at The Southern part of The former runway, stage12/28/2013 Completed
2013 Paul Y.Construction Co Ltd Supertructure Works for LMX Maintenance Building and Associated Works Substructure Works at DG Store8/30/2013 Completed
2013 Modern Terminal Ltd T12 Crane Rail System Upgrade Project Terminals 1 and 2 Crane Rail System Upgrade Project1/1/2013 Completed
2012 Friendly Benefit Engineering Ltd Wan Chai Development Phase II Central-Wan Chai Baypass at Wan Chai East12/5/2012 Completed
2012 Paul Y.Construction Co Ltd Improvenent Works for Supplies Building & Miscellaneous Works for Lamma Power Station Protective Lining 7/13/2012 Completed
2012 Modern Terminal Ltd Terminals 2 and 5 Quay structure rehabilitation works Underdeck Spalling Concrete Patching Work at T2 and T512/31/2012 Completed
2012 Asia Container Terminals Ltd Container Terminal 8 West Re-paving works for Rubber-Tyred container handling gantry runway at container terminal 8 west 1/6/2012 Completed
2011 Sun Chong (Civil) Engineering Kai Tak Development Kai Tak Development other part for the Drainage & Water main laying works6/16/2011 Completed
2011 Paul Y.Construction Co Ltd Ash Pit Reinstatement and Miscellaneous Improvement Works at Lamma Power Station Protective Lining and Repairs3/31/2011 Completed
2011 Paul Y.Construction Co Ltd Foundation Works for LMX Maintenance Building Earth Works11/1/2011 Completed
2011 Modern Terminal Ltd T125 and T9 Stacking Area Repainting of Thermoplastic Road Markings at T125 and CT9 Stacking Area1/1/2011 Completed
2011 Asia Container Terminals Ltd Container Terminal 8 West Replacement of Damaged Fender Pads 12/23/2011 Completed